ECL Building Exterior Repair Project

Construction Kickoff

Project Website

Purpose: To seal the windows, repair cracks, paint and pressure wash the building.

The new project to repair the exterior of the library  will consist of washing the exterior of the building, repairing any exterior concrete damage, painting the building and replacing building joint sealants.  The windows will have the old seals removed and replaced.

Project start date: January 19, 2015     Anticipated Project End date: May 8, 2015

Contractors will work Monday – Friday, 7:30 am – 5:30 pm.   Week-end work will be scheduled if necessary. 

All work, (with the exception of the three windows scheduled to be replaced near the connector on the South/Hospital Side of the building) will be accomplished from the outside of the building via two swing stages.  